Status Report Template Generator Эксперт по созданию эффективных статус-отчётов для проектной коммуникации на всех уровнях организации. Core Principles Foundational Requirements effective_status_report : principles : - name : "Consistent Formatting" description : "Use consistent structure and hierarchy across all reports" - name : "Audience-Specific" description : "Tailor depth and focus to reader's needs" - name : "Traffic Light System" description : "Green/Yellow/Red for quick visual assessment" - name : "Data-Driven" description : "Include specific dates, percentages, measurable outcomes" - name : "Actionable" description : "Clear next steps with ownership and deadlines" - name : "Honest" description : "Direct communication about issues while maintaining professionalism" Audience Differentiation Audience Focus Depth Frequency Executive Business impact, strategic alignment High-level metrics Weekly/Monthly Team Operational details, blockers Detailed tasks Daily/Weekly Client Deliverables, timeline Balanced detail Weekly Board Strategic metrics, risks Executive summary Monthly/Quarterly Stakeholders Relevant updates, decisions needed Customized As needed Standard Templates Executive Summary Template
Project Status Report: [Project Name] ** Report Date: ** [Date] ** Reporting Period: ** [Start Date] - [End Date] ** Report Author: ** [Name]
Executive Summary
Overall Status: 🟢 GREEN / 🟡 YELLOW / 🔴 RED | Dimension | Status | Trend | |
|
|
| | Schedule | 🟢 On Track | ↗️ Improving | | Budget | 🟡 At Risk | → Stable | | Scope | 🟢 On Track | → Stable | | Quality | 🟢 On Track | ↗️ Improving |
Key Highlights 1. [Major accomplishment with measurable impact] 2. [Important milestone reached] 3. [Significant decision made]
Attention Required 1. ** [Issue] ** - [Impact] - Decision needed by [Date] 2. ** [Risk] ** - [Mitigation status] - Escalation: [Yes/No]
Decisions Needed | Decision | Owner | Deadline | Impact if Delayed | |
|
|
|
| | [Decision description] | [Name] | [Date] | [Impact] | Progress Tracking Section
Progress Summary
Completed This Period | Task | Owner | Completed | Impact | |
|
|
|
| | [Task name] | [Name] | [Date] | [Business impact] | | [Task name] | [Name] | [Date] | [Business impact] |
In Progress | Task | Owner | % Complete | ETA | Status | |
|
|
|
|
| | [Task name] | [Name] | 75% | [Date] | 🟢 On Track | | [Task name] | [Name] | 40% | [Date] | 🟡 At Risk |
Upcoming (Next Period) | Task | Owner | Start Date | Priority | |
|
|
|
| | [Task name] | [Name] | [Date] | High | | [Task name] | [Name] | [Date] | Medium |
Milestone Tracker | Milestone | Baseline Date | Current Date | Variance | Status | |
|
|
|
|
| | Phase 1 Complete | Mar 15 | Mar 15 | 0 days | 🟢 Complete | | Phase 2 Complete | Apr 30 | May 7 | +7 days | 🟡 At Risk | | Go Live | Jun 1 | Jun 1 | 0 days | ⬜ Planned | Risk Management Matrix
Risk & Issue Management
Active Risks | ID | Risk Description | Probability | Impact | Score | Mitigation | Owner | Status | |
|
|
|
|
|
|
|
| | R01 | [Risk description] | High | High | 🔴 9 | [Mitigation plan] | [Name] | Monitoring | | R02 | [Risk description] | Medium | High | 🟡 6 | [Mitigation plan] | [Name] | Mitigating | | R03 | [Risk description] | Low | Medium | 🟢 2 | [Mitigation plan] | [Name] | Accepted | ** Risk Scoring: ** Low=1, Medium=2, High=3 | Score = Probability × Impact
Active Issues | ID | Issue Description | Severity | Impact | Resolution Plan | Owner | Target Date | |
|
|
|
|
|
|
| | I01 | [Issue description] | Critical | [Impact] | [Resolution] | [Name] | [Date] | | I02 | [Issue description] | Major | [Impact] | [Resolution] | [Name] | [Date] |
Escalations | Item | Escalated To | Date | Status | Resolution | |
|
|
|
|
| | [Description] | [Name/Committee] | [Date] | Pending | [Update] | Financial Summary
Financial Summary
Budget Overview | Category | Budget | Actual | Variance | % Used | |
|
|
|
|
| | Labor | $500,000 | $475,000 | $25,000 ↓ | 95% | | Hardware | $100,000 | $98,000 | $2,000 ↓ | 98% | | Software | $50,000 | $55,000 | -$5,000 ↑ | 110% | | Contingency | $50,000 | $10,000 | $40,000 ↓ | 20% | | ** Total ** | ** $700,000 ** | ** $638,000 ** | ** $62,000 ** | ** 91% ** |
Burn Rate Analysis
** Planned Monthly Burn: ** $100,000 - ** Actual Monthly Burn: ** $95,000 - ** Trend: ** 5% under budget - ** Projected End Cost: ** $665,000 (5% under budget)
Resource Utilization | Role | Planned Hours | Actual Hours | Utilization | |
|
|
|
| | Developers | 800 | 780 | 97.5% | | QA | 200 | 220 | 110% | | PM | 160 | 165 | 103% | Dashboard Templates Weekly Team Dashboard
Team Weekly Update: [Team Name] ** Week of: ** [Date Range]
This Week's Focus 🎯 [Primary objective for the week]
Wins 🏆
✅ [Accomplishment 1]
✅ [Accomplishment 2]
✅ [Accomplishment 3]
Challenges 🚧
⚠️ [Challenge 1] → [Action being taken]
⚠️ [Challenge 2] → [Action being taken]
Team Velocity | Sprint | Committed | Completed | Velocity | |
|
|
|
| | Current | 45 pts | 38 pts | 84% | | Previous | 40 pts | 42 pts | 105% | | Average | - | - | 95% |
Next Week Preview 1. [Priority 1] 2. [Priority 2] 3. [Priority 3]
Help Needed
[ ] [ Specific request 1 ] - [From whom] - [ ] [ Specific request 2 ] - [From whom] Monthly Executive Dashboard
Executive Dashboard: [Project/Program Name] ** Period: ** [Month Year]
At a Glance ┌─────────────────────────────────────────────────────────┐ │ SCHEDULE BUDGET SCOPE QUALITY TEAM │ │ 🟢 🟡 🟢 🟢 🟢 │ │ On Track At Risk On Track On Track On Track │ └─────────────────────────────────────────────────────────┘
OKR Progress
Objective 1: [Objective Name]
| Key Result | Target | Current | Progress |
|---|---|---|---|
| KR1: [Description] | 100 | 75 | ████████░░ 75% |
| KR2: [Description] | 50 | 45 | █████████░ 90% |
| KR3: [Description] | 10 | 10 | ██████████ 100% |
| ### Objective 2: [Objective Name] | |||
| Key Result | Target | Current | Progress |
| ------------ | -------- | --------- | ---------- |
| KR1: [Description] | 500 | 350 | ███████░░░ 70% |
| ## Strategic Alignment | |||
| - Business Impact: [Quantified impact on business metrics] | |||
| - Customer Satisfaction: [NPS or CSAT score change] | |||
| - Revenue Impact: [Revenue influenced or generated] | |||
| ## Key Decisions Made | |||
| 1. [Decision] - [Date] - [Impact] | |||
| 2. [Decision] - [Date] - [Impact] | |||
| ## Upcoming Milestones (Next 30 Days) | |||
| Milestone | Date | Dependencies | Confidence |
| ----------- | ------ | -------------- | ------------ |
| [Milestone] | [Date] | [Dependencies] | High |
| Advanced Techniques | |||
| Trend Analysis Integration | |||
| ## | |||
| Performance Trends (3-Month Rolling) | |||
| ### | |||
| Schedule Performance Index (SPI) | |||
| Month | |||
| Planned Value | |||
| Earned Value | |||
| SPI | |||
| Trend | |||
| ------- | |||
| --------------- | |||
| -------------- | |||
| ----- | |||
| ------- | |||
| Jan | |||
| $100,000 | |||
| $95,000 | |||
| 0.95 | |||
| - | |||
| Feb | |||
| $200,000 | |||
| $195,000 | |||
| 0.98 | |||
| ↗️ | |||
| Mar | |||
| $300,000 | |||
| $305,000 | |||
| 1.02 | |||
| ↗️ | |||
| ** | |||
| Analysis: | |||
| ** | |||
| Schedule performance improving. Current trajectory suggests on-time delivery. | |||
| ### | |||
| Cost Performance Index (CPI) | |||
| Month | |||
| Actual Cost | |||
| Earned Value | |||
| CPI | |||
| Trend | |||
| ------- | |||
| ------------- | |||
| -------------- | |||
| ----- | |||
| ------- | |||
| Jan | |||
| $100,000 | |||
| $95,000 | |||
| 0.95 | |||
| - | |||
| Feb | |||
| $190,000 | |||
| $195,000 | |||
| 1.03 | |||
| ↗️ | |||
| Mar | |||
| $280,000 | |||
| $305,000 | |||
| 1.09 | |||
| ↗️ | |||
| ** | |||
| Analysis: | |||
| ** | |||
| Cost efficiency improving. Projecting 5% under budget at completion. | |||
| ### | |||
| Velocity Trend | |||
| Velocity (Story Points) | |||
| 50 │ ╭─────╮ | |||
| 40 │ ╭────╯ ╰──── | |||
| 30 │────╯ | |||
| └────────────────────── | |||
| S1 S2 S3 S4 S5 S6 | |||
| Visual Health Dashboard | |||
| ## | |||
| Project Health Indicators | |||
| ### | |||
| Health Matrix | |||
| LOW IMPACT MED IMPACT HIGH IMPACT | |||
| ┌────────────┬────────────┬────────────┐ | |||
| HIGH PROBABILITY │ 🟡 │ 🟠 │ 🔴 │ | |||
| ├────────────┼────────────┼────────────┤ | |||
| MED PROBABILITY │ 🟢 │ 🟡 │ 🟠 │ | |||
| ├────────────┼────────────┼────────────┤ | |||
| LOW PROBABILITY │ 🟢 │ 🟢 │ 🟡 │ | |||
| └────────────┴────────────┴────────────┘ | |||
| ### Current Risk Distribution | |||
| - 🔴 Critical: 1 (Resource availability) | |||
| - 🟠 High: 2 (Integration complexity, Vendor dependency) | |||
| - 🟡 Medium: 4 | |||
| - 🟢 Low: 8 | |||
| ### Quality Metrics | |||
| Metric | Target | Actual | Status |
| -------- | -------- | -------- | -------- |
| Defect Density | < 0.5/KLOC | 0.3/KLOC | 🟢 |
| Test Coverage | > 80% | 85% | 🟢 |
| Code Review Coverage | 100% | 100% | 🟢 |
| Critical Bugs | 0 | 0 | 🟢 |
| Predictive Elements | |||
| ## | |||
| Predictive Analysis | |||
| ### | |||
| Completion Forecast | |||
| Based on current velocity and remaining scope: | |||
| Scenario | |||
| Completion Date | |||
| Confidence | |||
| ---------- | |||
| ----------------- | |||
| ------------ | |||
| Best Case | |||
| May 15 | |||
| 20% | |||
| Most Likely | |||
| May 28 | |||
| 60% | |||
| Worst Case | |||
| Jun 15 | |||
| 20% | |||
| ** | |||
| Factors affecting forecast: | |||
| ** | |||
| - | |||
| ↗️ Positive: Team velocity increasing, key risks mitigated | |||
| - | |||
| ↘️ Negative: Scope additions (+15 points), holiday schedule | |||
| ### | |||
| Budget Forecast | |||
| Metric | |||
| Value | |||
| -------- | |||
| ------- | |||
| Budget at Completion (BAC) | |||
| $700,000 | |||
| Estimate at Completion (EAC) | |||
| $665,000 | |||
| Variance at Completion (VAC) | |||
| +$35,000 (5% under) | |||
| To-Complete Performance Index (TCPI) | |||
| 0.95 | |||
| ### | |||
| Scope Creep Indicator | |||
| Scope Growth Rate | |||
| 15% │ ╭──── Warning Zone ──── | |||
| 10% │────╯ | |||
| 5% │ | |||
| 0% │════════════════════════ | |||
| Week 1 2 3 4 5 6 | |||
| Current Rate: 8% | Threshold: 10% | ||
| Report Types by Context | |||
| Client Status Report | |||
| # | |||
| [Project Name] - Client Status Report | |||
| ** | |||
| Report #: | |||
| ** | |||
| [Number] | |||
| ** | |||
| Date: | |||
| ** | |||
| [Date] | |||
| ** | |||
| Prepared for: | |||
| ** | |||
| [Client Name] | |||
| ## | |||
| Project Overview | |||
| ** | |||
| Overall Status: | |||
| ** | |||
| 🟢 On Track | |||
| We're pleased to report continued progress on [Project Name]. This week, we achieved [key milestone] and remain on track for [upcoming deliverable]. | |||
| ## | |||
| Deliverable Progress | |||
| ### | |||
| Completed Deliverables | |||
| Deliverable | |||
| Acceptance Date | |||
| Sign-off | |||
| ------------- | |||
| ----------------- | |||
| ---------- | |||
| [Deliverable 1] | |||
| [Date] | |||
| ✅ Approved | |||
| [Deliverable 2] | |||
| [Date] | |||
| ✅ Approved | |||
| ### | |||
| In Progress | |||
| Deliverable | |||
| Progress | |||
| Expected Delivery | |||
| ------------- | |||
| ---------- | |||
| ------------------- | |||
| [Deliverable 3] | |||
| 75% | |||
| [Date] | |||
| [Deliverable 4] | |||
| 40% | |||
| [Date] | |||
| ## | |||
| Timeline Update | |||
| [Visual timeline or Gantt chart summary] | |||
| ## | |||
| Items Requiring Your Input | |||
| 1. | |||
| ** | |||
| [Decision Item] | |||
| ** | |||
| - | |||
| Context: [Brief context] | |||
| - | |||
| Options: [A, B, C] | |||
| - | |||
| Recommendation: [Our recommendation] | |||
| - | |||
| Needed by: [Date] | |||
| ## | |||
| Next Steps | |||
| - | |||
| [Action 1] - [Date] | |||
| - | |||
| [Action 2] - [Date] | |||
| ## | |||
| Meeting Schedule | |||
| - | |||
| Next Status Call: [Date/Time] | |||
| - | |||
| Demo Session: [Date/Time] | |||
| Steering Committee Report | |||
| # | |||
| Steering Committee Report | |||
| ** | |||
| Program: | |||
| ** | |||
| [Program Name] | |||
| ** | |||
| Meeting Date: | |||
| ** | |||
| [Date] | |||
| ** | |||
| Prepared by: | |||
| ** | |||
| [PMO] | |||
| ## | |||
| Executive Summary | |||
| [2-3 sentence summary of overall program health] | |||
| ## | |||
| Program Dashboard | |||
| ### | |||
| Portfolio Status | |||
| Project | |||
| Status | |||
| Budget | |||
| Schedule | |||
| Key Issue | |||
| --------- | |||
| -------- | |||
| -------- | |||
| ---------- | |||
| ----------- | |||
| Project A | |||
| 🟢 | |||
| 🟢 | |||
| 🟢 | |||
| None | |||
| Project B | |||
| 🟡 | |||
| 🟢 | |||
| 🟡 | |||
| Resource constraint | |||
| Project C | |||
| 🔴 | |||
| 🔴 | |||
| 🟡 | |||
| Vendor delay | |||
| ### | |||
| Resource Allocation | |||
| Resource Pool | |||
| Allocated | |||
| Available | |||
| Utilization | |||
| --------------- | |||
| ----------- | |||
| ----------- | |||
| ------------- | |||
| Development | |||
| 45 | |||
| 50 | |||
| 90% | |||
| QA | |||
| 12 | |||
| 15 | |||
| 80% | |||
| Infrastructure | |||
| 8 | |||
| 10 | |||
| 80% | |||
| ## | |||
| Decisions Required | |||
| ### | |||
| Decision 1: [Title] | |||
| - | |||
| ** | |||
| Background: | |||
| ** | |||
| [Context] | |||
| - | |||
| ** | |||
| Options: | |||
| ** | |||
| - | |||
| Option A: [Description] - Cost: $X, Risk: Low | |||
| - | |||
| Option B: [Description] - Cost: $Y, Risk: Medium | |||
| - | |||
| ** | |||
| Recommendation: | |||
| ** | |||
| Option A | |||
| - | |||
| ** | |||
| Impact of No Decision: | |||
| ** | |||
| [Consequences] | |||
| ## | |||
| Strategic Risks | |||
| Risk | |||
| Impact | |||
| Mitigation | |||
| Owner | |||
| ------ | |||
| -------- | |||
| ------------ | |||
| ------- | |||
| [Risk 1] | |||
| [Impact] | |||
| [Action] | |||
| [Name] | |||
| ## | |||
| Financial Summary | |||
| - | |||
| ** | |||
| YTD Spend: | |||
| ** | |||
| $X of $Y budget (X%) | |||
| - | |||
| ** | |||
| Forecast: | |||
| ** | |||
| On/Under/Over budget by X% | |||
| Best Practices | |||
| Do's ✅ | |||
| best_practices | |||
| : | |||
| timing | |||
| : | |||
| - | |||
| "Send reports consistently (same day/time each period)" | |||
| - | |||
| "Allow 24 hours for review before meetings" | |||
| - | |||
| "Distribute before, not during, status meetings" | |||
| content | |||
| : | |||
| - | |||
| "Lead with executive summary" | |||
| - | |||
| "Use data and metrics, not just descriptions" | |||
| - | |||
| "Include both wins and challenges" | |||
| - | |||
| "Provide clear action items with owners and dates" | |||
| - | |||
| "Quantify everything possible" | |||
| formatting | |||
| : | |||
| - | |||
| "Use consistent templates across projects" | |||
| - | |||
| "Apply traffic light colors sparingly and consistently" | |||
| - | |||
| "Include visual elements for quick scanning" | |||
| - | |||
| "Keep executive summary to one page" | |||
| distribution | |||
| : | |||
| - | |||
| "Create audience-specific versions" | |||
| - | |||
| "Archive for historical analysis" | |||
| - | |||
| "Make searchable and accessible" | |||
| Don'ts ❌ | |||
| common_mistakes | |||
| : | |||
| - | |||
| mistake | |||
| : | |||
| "Burying critical issues" | |||
| impact | |||
| : | |||
| "Stakeholders blindsided by problems" | |||
| fix | |||
| : | |||
| "Lead with issues requiring attention" | |||
| - | |||
| mistake | |||
| : | |||
| "Activity reporting vs outcome reporting" | |||
| impact | |||
| : | |||
| "No clarity on actual progress" | |||
| fix | |||
| : | |||
| "Focus on completed deliverables and business impact" | |||
| - | |||
| mistake | |||
| : | |||
| "Vague language" | |||
| impact | |||
| : | |||
| "Ambiguity and miscommunication" | |||
| fix | |||
| : | |||
| "Use specific numbers, dates, percentages" | |||
| - | |||
| mistake | |||
| : | |||
| "Missing action items" | |||
| impact | |||
| : | |||
| "No accountability or follow-through" | |||
| fix | |||
| : | |||
| "Every issue needs owner and deadline" | |||
| - | |||
| mistake | |||
| : | |||
| "Over-optimistic assessment" | |||
| impact | |||
| : | |||
| "Lost trust when reality emerges" | |||
| fix | |||
| : | |||
| "Honest assessment with mitigation plans" | |||
| - | |||
| mistake | |||
| : | |||
| "Too much detail for executives" | |||
| impact | |||
| : | |||
| "Key points lost in noise" | |||
| fix | |||
| : | |||
| "Executive summary + detailed appendix" | |||
| Automation Integration | |||
| JIRA Integration Query | |||
| -- Sprint progress query for status report | |||
| SELECT | |||
| sprint_name | |||
| , | |||
| COUNT | |||
| ( | |||
| CASE | |||
| WHEN | |||
| status | |||
| = | |||
| 'Done' | |||
| THEN | |||
| 1 | |||
| END | |||
| ) | |||
| as | |||
| completed | |||
| , | |||
| COUNT | |||
| ( | |||
| CASE | |||
| WHEN | |||
| status | |||
| = | |||
| 'In Progress' | |||
| THEN | |||
| 1 | |||
| END | |||
| ) | |||
| as | |||
| in_progress | |||
| , | |||
| COUNT | |||
| ( | |||
| CASE | |||
| WHEN | |||
| status | |||
| = | |||
| 'To Do' | |||
| THEN | |||
| 1 | |||
| END | |||
| ) | |||
| as | |||
| todo | |||
| , | |||
| SUM | |||
| ( | |||
| CASE | |||
| WHEN | |||
| status | |||
| = | |||
| 'Done' | |||
| THEN | |||
| story_points | |||
| ELSE | |||
| 0 | |||
| END | |||
| ) | |||
| as | |||
| completed_points | |||
| , | |||
| SUM | |||
| ( | |||
| story_points | |||
| ) | |||
| as | |||
| total_points | |||
| , | |||
| ROUND | |||
| ( | |||
| SUM | |||
| ( | |||
| CASE | |||
| WHEN | |||
| status | |||
| = | |||
| 'Done' | |||
| THEN | |||
| story_points | |||
| ELSE | |||
| 0 | |||
| END | |||
| ) | |||
| * | |||
| 100.0 | |||
| / | |||
| NULLIF | |||
| ( | |||
| SUM | |||
| ( | |||
| story_points | |||
| ) | |||
| , | |||
| 0 | |||
| ) | |||
| , | |||
| 1 | |||
| ) | |||
| as | |||
| completion_percentage | |||
| FROM | |||
| issues | |||
| WHERE | |||
| sprint_id | |||
| = | |||
| :current_sprint | |||
| GROUP | |||
| BY | |||
| sprint_name | |||
| ; | |||
| Slack Status Bot Template | |||
| // Automated status collection bot | |||
| const | |||
| statusPrompt | |||
| = | |||
| { | |||
| blocks | |||
| : | |||
| [ | |||
| { | |||
| type | |||
| : | |||
| "section" | |||
| , | |||
| text | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "mrkdwn" | |||
| , | |||
| text | |||
| : | |||
| "Weekly Status Update\nPlease provide your status for the week:" | |||
| } | |||
| } | |||
| , | |||
| { | |||
| type | |||
| : | |||
| "input" | |||
| , | |||
| element | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text_input" | |||
| , | |||
| action_id | |||
| : | |||
| "accomplishments" | |||
| , | |||
| multiline | |||
| : | |||
| true | |||
| , | |||
| placeholder | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "What did you accomplish?" | |||
| } | |||
| } | |||
| , | |||
| label | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "Accomplishments" | |||
| } | |||
| } | |||
| , | |||
| { | |||
| type | |||
| : | |||
| "input" | |||
| , | |||
| element | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text_input" | |||
| , | |||
| action_id | |||
| : | |||
| "blockers" | |||
| , | |||
| multiline | |||
| : | |||
| true | |||
| , | |||
| placeholder | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "Any blockers or challenges?" | |||
| } | |||
| } | |||
| , | |||
| label | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "Blockers" | |||
| } | |||
| } | |||
| , | |||
| { | |||
| type | |||
| : | |||
| "input" | |||
| , | |||
| element | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text_input" | |||
| , | |||
| action_id | |||
| : | |||
| "next_week" | |||
| , | |||
| multiline | |||
| : | |||
| true | |||
| , | |||
| placeholder | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "What's planned for next week?" | |||
| } | |||
| } | |||
| , | |||
| label | |||
| : | |||
| { | |||
| type | |||
| : | |||
| "plain_text" | |||
| , | |||
| text | |||
| : | |||
| "Next Week's Focus" | |||
| } | |||
| } | |||
| ] | |||
| } | |||
| ; | |||
| Лучшие практики | |||
| Консистентность важнее красоты | |||
| — используй один и тот же шаблон | |||
| Executive summary всегда первым | |||
| — руководители читают только его | |||
| Честность в оценках | |||
| — лучше предупредить о рисках заранее | |||
| Конкретика вместо общих фраз | |||
| — "завершено 75%" вместо "почти готово" | |||
| Action items с владельцами | |||
| — каждый риск и issue должен иметь ответственного | |||
| Архивируй отчёты | |||
| — они нужны для post-mortem и планирования | |||
| Адаптируй под аудиторию | |||
| — разная глубина для разных читателей |